Walker Builds a Greenhouse
16 feet long, 7 feet wide, 74 inch exterior walls.
A winter home for our plumeria, passion fruit, and other plants.

 
Home (Ctrl-Home) Next Thumbnail Page (Right Arrow) Last Thumbnail Page (Ctrl-Right Arrow)
Photo of 80
Foundation beam in place and framing just started.  All wood is pressure treated.
The outside dimensions are 16 feet x 7 feet.  The walls are 74 inches high above the foundation beam. Pavers are under the foundation beam to keep it above ground.  The pavers have not been leveled yet.
11/06/03
3:47 PM
Foundation beam in place and framing just started.  All wood is pressure treated.
The outside dimensions are 16 feet x 7 feet.  The walls are 74 inches high above the foundation beam. Pavers are under the foundation beam to keep it above ground.  The pavers have not been leveled yet.
11/06/03
3:47 PM
Foundation beam in place and framing just started.  All wood is pressure treated.
The outside dimensions are 16 feet x 7 feet.  The walls are 74 inches high above the foundation beam. Pavers are under the foundation beam to keep it above ground.  The pavers have not been leveled yet.
11/06/03
3:47 PM
Foundation beam in place and framing just started.  All wood is pressure treated.
The outside dimensions are 16 feet x 7 feet.  The walls are 74 inches high above the foundation beam. Pavers are under the foundation beam to keep it above ground.  The pavers have not been leveled yet.
11/06/03
3:47 PM
Foundation beam in place and framing just started.  All wood is pressure treated.
The outside dimensions are 16 feet x 7 feet.  The walls are 74 inches high above the foundation beam. Pavers are under the foundation beam to keep it above ground.  The pavers have not been leveled yet.
11/06/03
3:48 PM
Pavers have been leveled and concrete foundation beam poured inside them and under wooden foundation beam.  The PVC extending from the garage eave into the ground provides the electrical service to the greenhouse.  Electrical service is stubbed up through concrete on right.
11/08/03
7:59 AM
Pavers have been leveled and concrete foundation beam poured inside them and under wooden foundation beam.
11/08/03
8:00 AM
Pavers have been leveled and concrete foundation beam poured inside them and under wooden foundation beam.  Electrical service is stubbed up through concrete on left.
11/08/03
8:00 AM
You can not pour concrete without putting your initials in it!
11/08/03
8:00 AM
Wall framing complete.
11/08/03
11:55 AM
Wall framing complete.
11/08/03
11:55 AM
First four rafter sets and ridge beam in place.
11/08/03
4:59 PM
First four rafter sets and ridge beam in place.
11/08/03
5:00 PM
First four rafter sets and ridge beam in place.
11/09/03
7:52 AM
First four rafter sets and ridge beam in place.
11/09/03
7:53 AM
Roof complete.
11/15/03
12:27 PM
Roof complete.
11/15/03
12:27 PM
Foil tape covering rafters and ridge beam.
11/16/03
9:37 AM

Click on any of the small pictures to view it in a larger size

Plants And Gardening

Site Map

This page and the contents thereof are the property of Walker Mangum
Copyright © 2003 - 2012 by Walker Mangum
All rights reserved
Images on this page may not be reproduced without the express consent of Walker Mangum

Page created by Pyzaz